Track Monitoring at Ennis Train Station

Monitoring prisms were installed at 3 metre intervals as per Irish Rail document ‘CCE-TRK-SPN-010 Specification for Movement Monitoring of Railway Track and Digital Safety File Requirements’. Coping stones were also to be monitored at 2m centres over a length of 23m on each side.
Read More
newsemp

Survey of City Centre Site with Extensive Contextual Data Requirement

This was a sensitive site, in the Dame Street area, so it was necessary to demonstrate the impact of the proposal on the surrounding Architecture. This necessitated the surveying of approximately 700 linear metres of streetscapes in the city centre.
Read More
newsemp

Project Control and Setting Out

Techsol were tasked with setting out every aspect of this facility from Greenfield Site to finished plant.
Read More